With colocation, you keep ownership of the hardware and place it in a data centre. Agree the physical, electrical and network details before shipping. The quote should make it clear which responsibilities belong to the operator and which remain with your team.
Confirm shipment and installation
Provide the hardware models, chassis depth, rack units, weight and rail requirements. Ask for receiving instructions, labels and the accessories to include. The New Jersey location page describes shipment receipt, rack installation and console assistance. Confirm which work applies to your equipment and appears in its quote.
Size power for real operation
Collect typical and peak power measurements. Confirm voltage, connectors, permitted load and how power is billed. For A/B feeds, check their independence and what one feed can carry when the other fails. Two power supplies alone do not establish that the installed circuit arrangement meets the requirement.
Specify the network arrangement
Record port speed, transfer accounting, IP allocation and routing requirements. If the project needs IP transit or a cross-connect, confirm whether it is part of the order and who arranges it. Define console requirements and which external networks should be included in acceptance tests.
Prepare for remote hands
List permitted physical actions, such as checking a cable, rebooting on instruction or replacing a labelled drive. Name the contact who may authorize them. Ask how requests are scheduled, charged and supported with spares. The provider's general terms describe physical intervention as queued work. Confirm the timing and scope for the selected facility.
A conditional power failure check
Suppose a server with two power supplies must survive the loss of one feed. Before shipping, the team checks representative operation on one supply and agrees the required load per feed with the facility. At acceptance it verifies the installed connections and the diagnostic path. Any deliberate interruption requires a coordinated test procedure.
Plan acceptance and removal
After installation, verify the serial number, power, network and console access. Document incident contacts and the spare inventory. Before ordering, confirm how the equipment will be unracked and returned, including shipping arrangements and any charges during removal.
Compare the available models
If the hardware is still undecided, see Dedicated servers: choosing a configuration and Dedicated server pricing: configuration and full budget. Discuss placement requirements through hosting selection.